Project Brief

Project included various heavy kg/m slim floor beams and 17m long welded trusses, floor decking and shear studs.

Category

Client

Charlemont Regeneration

Tonnage

160 T

Main Contractor

John Paul Construction

Engineer

OCSC – O’Connor Sutton Cronin & Associates

Project Description

Turners was a fast track project, consisting of 3 temperature controlled buildings. Large open floor spaces were required for chiller areas, Wall steel fabricated and erected 42m long trusses on this project.